top of page

BIM COORDINATION

3D Coordination drawings build the job before it even started avoiding physical conflicts between equipment, building space and the surroundings, and between trades. Running clash detection helps to report major interferences between trades. Also, with BIM coordination software the model is updated when changes have been made.  Clash detection can save the owner, and all trades an enormous amount of time and money, reducing change orders and rework in the field up to 80%.

bottom of page